Projects
Esplanade Riel Bridge Lighting Upgrades
Project Type: Design-Build
Project Date: Feb-Aug 2022
​
Summary: Tri-Star Traffic was selected to provide design build services for the lighting upgrades at Esplanade Riel Bridge in Winnipeg, MB.
The new lighting system includes 55, independently controlled, RGBW LED, fixtures that will be used to create impactful and dynamic effects throughout the year and to mark special events and holidays.
Portage Causeway
Project Type: Subcontractor
Project Date: 2020-21
​
Summary: Tri-Star Traffic was contracted to supply and install street lighting, accent lighting, electrical distribution, traffic signage, duct bank, and supporting infrastructure/
Corydon BIZ
Project Type: Design-Build, Maintenance
Project Date: 2017-2022
​
Summary: Over several years and multiple projects, we have worked closely with the Corydon Business Improvement Zone to design, supply, install, and maintain a variety of LED lighting systems and road-spanning structures.
Canadian Tire EV Chargers
Project Type: Subcontractor
Project Date: 2020-21
​
Summary: Tri-Star Traffic was contracted by Addenergie Flo to install Level 2 and Level 3 DCFC Electric Vehicle chargers at 5 Canadian Tire locations in Manitoba.
Services included:
- Design, supply, and installation of electrical distribution
- Construction drawings
- Installation of underground electrical, meter cabinet, CSTE, Chargers, and foundations.